Process industry

Emergency boiler pipe repair in zinc processing

24-hour response to a critical boiler pipe failure in a sulphur-containing process environment: on site on a Sunday, with a durable repair developed together with the customer.
Defecte ketelpijp in een zinkverwerkend bedrijf

The challenge

In July 2026, a boiler pipe at a zinc processing facility suffered a sudden failure. The installation operates in a sulphur-containing process environment where temperature, pressure and process media place significant demands on materials and welded connections.

Because the failure occurred during the weekend, minimising downtime was critical. But the priority was not simply to restore the pipe as quickly as possible: the repair had to be durable and practical to execute within the available shutdown window.

Our assignment

CQM Welding was called in for an urgent intervention and responded within 24 hours, on a Sunday. Together with the customer’s technical team, we assessed the failure and determined the most appropriate repair strategy, then executed the repair on site.

Our approach

Joint assessment. Rather than immediately proceeding with a standard repair, we evaluated the situation with the customer and weighed technical integrity, material and welding considerations, operating conditions, accessibility, required downtime, long-term reliability and efficiency of execution.

On-site execution. Once the repair strategy was agreed, we mobilised the required personnel, welding equipment and materials. The intervention was coordinated closely with the customer’s operations, maintenance and safety requirements.

Project details

Sector: Process industry
Services performed: Certified Welding & Piping, Industrial Interventions, Welding Engineering & Specialised Welding
Period: July 2026
Material: 16Mo3
Response: on site within 24 hours

The result

On site within 24 hours, on a Sunday

By responding within 24 hours on a Sunday, CQM Welding helped the customer address a critical boiler pipe failure without unnecessary delay. The intervention was approached as an engineering and welding problem: together with the customer, we implemented a solution that balances speed, technical integrity and long-term reliability.

Defecte ketelpijp in een zinkverwerkend bedrijf
Herstelling van een ketelpijp op locatie

A similar challenge? Discuss your project

Tell us about your installation and assignment. We will look at the expertise and execution needed.