During a planned shutdown of a power plant, a new 16Mo3 valve had to be installed and welded into an existing high-temperature piping system. The work required precise preparation, correct positioning and controlled welding.
At the same time, the intervention had to fit into the customer’s overall shutdown schedule, with multiple maintenance activities taking place in parallel.
CQM Welding was engaged for the specialist welding needed to integrate the new valve into the existing installation, and took responsibility for the welding intervention on site.