Energy

300 bar DMV310N piping replacement

Replacement of a valve manifold in a 300 bar installation with DMV310N piping, welded with Alloy 617 filler metal under strict process control.
Lasser van CQM Welding aan het werk in een industriële installatie

The challenge

A valve manifold in a high-pressure installation operating at 300 bar had to be replaced. The existing piping was made of DMV310N, a demanding high-temperature material that requires strict control during welding. Because of the critical service conditions, the replacement required a strong focus on welding quality and process control.

Our assignment

CQM Welding performed the welding required to integrate the new valve manifold into the existing DMV310N piping system.

Our approach

For the welds, Alloy 617 filler metal was used in accordance with the qualified welding procedure. The welding parameters and thermal conditions were carefully controlled to ensure the integrity of the connections under the demanding operating conditions.

Project details

Sector: Energy
Services performed: Certified Welding & Piping, Welding Engineering & Specialised Welding
Period: June 2026
Material: DMV310N, Alloy 617 filler metal
Pressure: 300 bar

The result

300 bar. DMV310N. Alloy 617.

The valve manifold was successfully replaced and welded into the 300 bar piping system, giving the customer a reliable and technically controlled solution for continued operation.